Below is a recap of the Board meetings held in October.
π§ Temporary Street Closures for Events Process:
The Board adopted a formal process for temporarily closing streets for neighborhood events.
- Residents needing to close a street for an event must submit an application at least 14 days prior to the proposed event date
- The application should include date, time, location, description of the event, and must include signatures of approval from at least 70% of the households whose properties are directly affected by the closure
- Full details on the new policy can be found HERE
- The application for events can be found HERE
βΈ»
β Approved Projects:
- Cypress/Eastland Grading and Sod β Phase 2
Full grading and sod repair for the creek and lakes between Cypress and Eastland - Cypress Well Repairs:
Repair to the Cypress well which was hit by lightning this fall. The majority of the cost was covered by insurance. - Landscaping Repair:
Bed and sod repair near the Indigo/Grange lakes, and installation of rip-rap in the Maydelle tributary, as well as a new fence for Avondale Ct in the far-north portion of Sweetwater
βΈ»
π Looking Ahead:
Various projects are still underway, including sod behind Crescent Dr, sidewalk repairs, and the tree replacement project. The Board will continue to evaluate areas around the neighborhood for enhancement and repair.