Please reference the list, below, for all recently completed and pending projects in the Light Farms community.
Recently Completed Projects
- Installation of crosswalk at Meridian and Cypress Creek Way by Light Farms Elementary
- Installation of mulch along all the main roads, medians and entrance ways to the neighborhoods
- Removal of decorative grass at crosswalks near Constellation Lake on and Montessori school and replacement with sod
- Removal of decorative grass in blind spot on Light Farms Way outside of Grange and replacement with sod
- Completion of gabion basket project between tributaries behind Grange/Indigo, pending some landscaping repair
- Lowering of intake pipe for the Cypress well a total of 168 feet so it would reach the lowered water table levels – this will get the well fully functional again and assist with irrigation around Cypress and Sage
- Repair/replacement of multiple sidewalk panels along Light Farms Way and residential areas
- Repair of landscape at corner of Light Farms Way and Cypress Creek Way (near tennis courts)
- Removal of bushes on Parkview/Bridgewater to improve sight lines for motorists
- Repainting of decorative fence along Light Farms Way near Constellation Lake
- Sod and landscaping work along Worthington (outside of Sage and Cypress)
- Sod and landscaping work along Cypress Creek (outside of Graham)
- Installation of 4-way stop signage at Laughlin Lane and Starlight Creek
- Replacement of damaged wrought iron fence panel about pedestrian tunnel between Light Farms Elementary and Eastland
- Cover up of graffiti in tunnel between Light Farms Elementary and Eastland
Pending Projects (November/December 2024)
- Transplant or removal of trees by crosswalks at Meridian/Cypress Creek and Light Farms/Homestead
- New road striping for crosswalks at Meridian/Cypress Creek and Light Farms Way
- Installation of crosswalk signage at Homestead/Light Farms Way
- Installation of crosswalk signage at Parkview/Bridgewater
- Continuation of tree replacement project from this summer (map pending)
- Warrant study results for 4-way stop signage at Cypress Creek/Light Farms Way and Forefront/Light Creek Ln
- Warrant study results for crosswalk installation at Light Farms Way and Sweetwater
- Installation of fences around each well-pump site (Cypress, Graham and Bridgewater)
- Enhancement of fencing around Indigo well-pump site
Items Awaiting Board Approval
- Bids for landscaping repair behind Hudson Dr
- Bids for landscaping repair along Maydelle Ave
- Bids for erosion repair on first lake next to Bridgewater/Prairie Crossing
- Bids for sidewalk enhancements on trails behind Grange/Sweetwater